Welcome to the official website of Zhisheng

Twenty years of industry drying solutions!

Specializing in PCB, FPC, optoelectronics, chips, semiconductors and other high-end drying solutions

Hottel

+86 18126178948

Product Center

Hottel

+86 18126178948
prevnext

Film pressing and cutting machine

  • Suitable for: FPC, film, new energy and other film cutting.
  • Hottel:+86 18126178948
  • Product Details

model

PDJ-500

workflow

Automatic feeding-automatic cleaning-automatic dripping-automatic pasting-automatic cutting-automatic receiving (receiving mode selection: simple receiving/robot receiving)

 

The laminating machine is simple to operate.

PLC computer automatic control


Power Supply 

220V/50HZ

air supply

6KG/ cm2

Effective width of film pasting

500mm

area of application

The width of the plate is ≥50mm, and the length of the plate is infinite.

slab thickness

0.05-0.3mm

speed

0-10M

mode of heating

1200W heating tube X2

Overall power

5KW

quality

400KG (approximately)

remarks

The above is subject to the real thing.


deploy

Basic configuration of laminating machine: temperature control is imported Omron brand and bearing imported brand.

The cots are coated with imported rubber compound, and the electrical appliances are Omron imported brands.

1. The motor is a Taiwan Province brand motor, and the cots are imported from Japan (the hardness of the material is 60-65 degrees).

2. The bearing is imported high-temperature resistant brand, and the temperature difference of the rubber roller is 3 degrees.

3. Unique membrane dismounting mode, simple and convenient membrane replacement, and more stable membrane operation.

4. Convenient and accurate membrane alignment device saves the debugging time of operators.

5, temperature control: high-precision PID, contact temperature probe, room temperature 180 automatic heating imported heating wire.

6. Consumables: laminating wheel coated with glue and heating wire.

remarks

High-end imported configuration ensures stable product performance, flat film pressing and no bubbles.

deliver goods

Party B shall be responsible for the freight transportation.

Acceptance criteria, training and after-sales service

After the equipment installation and debugging is completed, Party B shall assist Party A in acceptance.

Party B shall provide training for Party A‘s equipment operation, fault maintenance and troubleshooting, with a shelf life of one year, counting from the arrival of the equipment;

During the warranty period, Party B needs to repair and replace spare parts for non-human factors provided by Party A free of charge; After the warranty period expires, Party B shall provide Party A with preferential price and paid maintenance service in time after receiving the failure notice from Party A; The after-sales response time is within 2 hours.

Name of wearing parts

Glue coating and cutting knife for film pressing wheel